This factory floor in Yorkshire had years of built-up old paintwork and surface contamination from continuous production use, leaving the concrete worn and no longer providing a sound base for a new coating.
Our team carried out dust-free captive shot blasting to strip back the old coating and mechanically key the surface, giving a clean, sound base ready for a new floor coating system.
The finished floor was left ready for a fresh factory floor paint system — durable, easy to maintain, and built to withstand ongoing production traffic.
This job forms part of Intercity Contractors’ wider factory floor painting service, from initial shot blasting and surface preparation through to a full epoxy or resin floor coating system, tailored to the demands of your production environment
Intercity Contractors was founded by Andrew Marshall nearly three decades ago, in 1997, as a family-run business. Andrew and our project management team stay hands-on with every job, from initial survey and client liaison through to completion — so each floor painting and shot blasting project is delivered to the standard we’ve built our reputation on since 1997.