We at Intercity recently have refurbished the Lamborghini workshops in Stockport
The floor was first shot blasted to remove the existing coating, following that it has a 2 pack epoxy clear primer, then finally given 2 coats of 2 pack epoxy high build paint.
The image is the finished outcome, which Lamborghini were very happy with.
![](https://intercity-contractors.co.uk/wp-content/uploads/2024/05/IMG_0200-e1445611682408-768x1024.jpg)